色噜噜噜-日韩1024-华人永久免费视频-久久久久综合网-天天做天天爱夜夜爽-九九免费精品视频-久章操-久久久区-国产精品系列在线播放-久久久久女-欧美 日韩 国产 中文

Navigation

Sewage project case

TYPICAL CASES OF BOT PROJECT AND ENGINEERING CONSTRUCTION
Author:Dongda Environment Time:2020-12-27 Clicks:190

TYPICAL CASES OF BOT PROJECT AND ENGINEERING CONSTRUCTION
 
300m3/d landfill leachate treatment and reconstruction project
After transformation, the treatment capacity of the project reaches 300m3 / d, and the effluent quality meets the table 2 standard in the (GB 16889-2008). It was put into operation in November 2010.
Treatment process: Coagulation sedimentation--Hydrolysis acidification--A2O process--ozonation--MBR--Ultrafiltration--Nanofiltration--Reverse osmosis.
The project has advanced treatment technology, stable and reliable operation, strong anti shock load capacity of the whole treatment system, and can ensure that the effluent quality meets the discharge standard.
300m3/d landfill leachate treatment and reconstruction project
112m3/h Ultra pure water project
The processing capacity of the project is 112m3 / h, which was officially put into use in August 2017. Using two-stage reverse osmosis + EDI process, the resistivity of treated effluent is above 16m. Cm.
Treatment process: sand filtration, carbon filtration, secondary reverse osmosis, EDI.
The project has the advantages of compact structure, less floor space, stable operation, good effluent quality, easy automation, convenient operation and management, and has the advantages of no acid-base regeneration and low operation & maintenance cost compared with the mixed bed.
112m3/h Ultra pure water project
Whatsapp Phone QR code

Telephone

0086-0575-87139000

Scan and follow us